Welcome
The posts are presented in reverse chronological order (newest first). Or you can click on one of the "Labels" to see all of the posts concerning a specific topic. Click on any photo for a larger image.
All my building experience is limited to Van's RV's so I have no experience with building tube and fabric or "plans building". I have much to learn so take everything I write with a grain of salt and reasonable skepticisim.
I do not intend to follow a "traditional" path for the construction of #88. I intend to employ low level technology and $ to reduce the construction time and difficulty where possible and practical. By low level technology I am referring to CAD, laser, waterjet, CNC. For example:
- I have purchased a complete wing spar kit from Jerry Kerr.
- A rib kit from Mr. Bartoe.
- Brunton Flying Wires and Drag wires from Harvey Swack.
- CNC profiled tube kits for the fuselage, tail feathers and landing gear from VR3.
In addition I have converted all of the wing fittings, brackets, links, lugs etc. to CAD and had them cut by water jet. I have designed a laser cut wing spar drill template/jig which positions the five spar components so that all of the holes can be drilled in a complete spar as an assembly. I plan to continue converting as many parts as I can to CAD so that I can reduce the "hand-made" components to a minimum.
Note: As of June 2015 I have over 100 CAD files which provide 600+ water jet cut parts for the Skyote.
While it takes a little time, converting the design to CAD is a great way to truly understand the drawings. plus a huge amount of information has been extracted from the rather complex drawings. This can be a great help to others in understanding and interpreting the design.
The Skyote is uniquely suited for conversion to CAD in that a "computer" was used in it's original design. I have read that Mr. Bartoe used a HP calculator to "compute" the design and dimensions of the Skyote. The plans show all of the critical dimensions to three decimal places for X,Y and Z axes.
Amazingly, when I put the design into CAD the resulting 3D models agree with Mr. Bartoe's thee decimal place dimensions about 99.9% of the time. I have found one discrepancy but less than 0.030"!
If you want to build your Skyote as cheaply as possible, or if you enjoy handcrafting the same parts over and over again then my approach to building is not for you!
If you want to build your Skyote in the minimum possible time with highly accurate parts then this approach may be the answer. I personally get a lot of satisfaction out of organizing the project so that it can be produced accurately. Hopefully some of this work will prove useful to others in the future.
Thursday, February 28, 2008
Installing Motor Mount Bushings
Friday, February 22, 2008
Aligning Landing Gear & Wing Attach Parts
Tuesday, February 19, 2008
EAA SportAir Fabric Workshop
Thursday, February 14, 2008
Wing & Gear Attach Fittings
Monday, February 11, 2008
New Waterjet Source

Saturday, February 2, 2008
RV rudder Pedals for the Skyote?

Thursday, January 31, 2008
The Fuselage is Tack Welded
Saturday, January 26, 2008
Prepping Fuselage for Welding
I have arranged with Dale Doane, an A&P who works for Delta to weld my fuselage. Dale plans to fly his Cessena from Atlanta and tack weld the fuse here in my shop. I will then take the fuse in my truck to his shop in Atlanta for finish welding. We had hoped to get started this week but now it looks like the weather isn't going to cooperate.
Glenn Bridges has his VR3 fuse all jigged and polished and started tack welding today. looks like he will be ahead of me for a while!
Wednesday, January 16, 2008
Center Section Spacers
Next will be the 1"x 1" x 1/8" "C" channel fittings for the ends of the compression struts.
Tuesday, January 15, 2008
Rib to Leading Edge Clips
leading edge tubes today.
"gang" bent them as a group to save time. The bender is so accurate I was able to adjust for the added thickness of the tape so the bends would come out exactly right.
I had to push the holes outward toward the ends of the
angle legs a little. As drawn, there is not sufficient room for
a rivet puller to operate. The drawing
references " 4 number 3 rivets". The rivets which go in
the tube must of course be pulled rivets
Saturday, January 12, 2008
Compression Strut Bushings
Priming the Spars
The three cans in the picture......$335.45 +tax Ouch!
Bending Rib-to-spar clips
Monday, December 24, 2007
Teardrop Aluminum Strut Material
David Gordon
AED Motorsport Products 5373 West 86th Street Indianapolis, Indiana 46268 USA Phone: 317-334-0569 / US Toll-free 888-413-0233 Fax: 317-879-9397
Sunday, December 16, 2007
Drilling First Main Spar
Wednesday, December 12, 2007
Excellent Fuselage Construction Book
VR3 Final Report
The new joint design provides the same "perch" for the fittings, but eliminates the need for plugging the end of the longeron tube by mitering it to the vertical firewall tube. Since a picture is worth a thousand words, just take a look at the latest posting in the VR3 photo album. Others may take issue, but I am satisfied that the new joint is structurally equivalent to Pete's design while being easier and more accurate to build.
I am very happy with the VR3 kit. I have had a couple of experienced tube fuse builders look at it and they said that it would not be possible for them to duplicate the accuracy and fit quality using the traditional manual profiling methods.
The VR3 kit is about the same cost as Pete Bartoe's rib kit. In my opinion, the VR3 is at least, if not more of a time saver, than the rib kit. I think I could eventually hammer out the ribs if I had to. I'm not sure that I would ever get the fuse hand fitted to a point that would make me happy.
In my book, there are only two valid reasons not to go with the VR3 kit:
(1) You WANT to fit the tubes yourself.
(2) You can't justify the $$.
If you are not burdened by either of the above "problems" then VR3 is the way to go.
In conclusion, I have no connection with VR3, financial or otherwise.
Sunday, December 9, 2007
Aluminum Spacers
The spacers are a perfect fit with the 5/16" 4130 tubing which will be used to make the bushings that fit inside.
.jpg)
.jpg)
.jpg)